ETSI GS OEU 008: Operational energy Efficiency for Users (OEU); Global KPI for Information and Communication Technology Nodes
Name of Initiative/Methodology

Operational energy Efficiency for Users (OEU); Global KPI for Information and Communication Technology Nodes

Link to the latest published version

ETSI GS OEU 008 (09/2013): Version 1.1.1

gs_OEU008v010101p.pdf

Developed by

The European Telecommunications Standards Institute (ETSI)
History and Status
  • Work undertaken during 2013
  • Published in September 2013
Involved companies / parties
  • EADS
  • Thales
  • PSA Peugeot Citroen
  • Orange SA
Scope

Organisation env. accounting

 Scope 1  
 Scope 2  
 Scope 3

Product env. assessment 

 Life cycle approach  

 Use phase only

 GWP

 Energy (focus on secondary energy)

 KPIs

  • Energy consumption
  • Task efficiency
  • Energy reuse
  • Renewable energy
System(s) covered by the methodology

Data centres or operator sites (ICT node operations)

Goals
  • Improving energy usage and efficiency of an ICT node through a reduction in energy consumption, improvements in task efficiency, the re-use of energy and the contribution of renewable energy
  • Providing methodological framework for the definition and calculation of Key Performance Indicators (KPI) in relation to the objectives described above (one global indicator + 4 objective indicators)
Generic features
  • The indicators apply to systems of any size from initial operation to end of life
  • The reduction in energy consumption and task efficiency are primary objectives
  • Energy sources may be utility (from the grid), fossil or renewable local power sources, hydrothermal energy or aeraulics power source.
  • The definition of task efficiency should specify the difference with “Power Usage Effectiveness” if relevant
ICT-specific features

The indicators apply to any buildings containing IT rooms, technical infrastructure and spaces required for proper operation of the data centre. Buildings containing offices for on-site employees are excluded.

Examples of implementation / experience feedback

None identified – to be filled later

Interaction with other methodologies
  • [EN 50600] Information technology - Data centre facilities and infrastructures
  • [ETSI OEU 001] Operational energy Efficiency for Users (OEU); Technical Global KPIs for Data Centres
  • [EC Mandate M/462] Standardisation mandate addressed to CEN, CENELEC and ETSI to enable efficient energy use of ICT networks
  • [ETSI ES 205 200] Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Global KPIs; Operational infrastructures
  • [ETSI TS 105 174] Access, Terminals, Transmission and Multiplexing (ATTM); Broadband Deployment - Energy Efficiency and Key Performance Indicators
  • EC DG JRC Code of Conduct for Data Centre Energy Efficiency
  • EC DG JRC Code of Conduct on Energy Consumption of Broadband Equipment
  • [Kyoto Protocol] to the United Nations Framework Convention on Climate Change

 

How do I use this methodology? Ask for support!

 

european commission© 2018 ICTFOOTPRINT.eu – ICTFOOTPRINT.eu has received funding from the European Commission’s Horizon 2020 research and innovation programme under the Grant Agreement no 690911. The content of this website does not represent the opinion of the European Commission, and the European Commission is not responsible for any use that might be made of such content.